Kitchen Remodel vs Refacing in Palm Beach: How To Decide?
Dec 9, 2025
A kitchen project can start with one simple question: do you refresh what’s there or rebuild it right?
Between cabinet refacing, full remodels, and everything in between, the right choice depends on structure, function, and how you use the space.
Here’s a clear breakdown of costs, timelines, and results to help you decide what’s worth doing – and what isn’t.
Key Notes
Refacing costs $4K–$9.5k in Palm Beach; full remodels start around $10k.
Remodeling allows layout changes, new cabinetry, lighting, and long-term functionality improvements.
Refacing is faster and cheaper but limited to cosmetic updates on sound cabinet structures.
Custom cabinetry in remodels offers better durability, storage, and resale value in South Florida homes.
Remodel vs Refacing: What Each Really Means
Kitchen remodeling is a complete rework of the space. It involves layout changes, new cabinetry, new surfaces, upgraded lighting, plumbing, and electrical adjustments.
It’s the route when you need both aesthetic and functional change – storage, lighting logic, durability, and long‑term value.
Cabinet refacing is a surface-level transformation. You keep the existing cabinet boxes but replace the doors, drawer fronts, and hardware.
It’s cosmetic, quick, and cost-effective when the bones of the kitchen are solid.

Cost, Time & Disruption in Palm Beach
Renovation costs vary dramatically depending on size, materials, and whether you touch plumbing or electrical.
Here’s how it breaks down locally:
Cabinet Refacing in Palm Beach:
Average range: $4,000–$9,500
Smaller kitchens: Closer to $4K
Larger or premium materials: $9K+
Cost drivers: Material (laminate vs solid wood), number of cabinets, hardware quality, and labor.
Full Kitchen Remodel in Palm Beach:
Minor refresh: $10,000–20,000
Mid-range remodel: $25,000–70,000
High-end, full gut remodel: $70,000–130,000+
Cabinets alone can be 30% of total cost.
Time and Disruption:
Refacing: Usually done in 3–7 days, minimal mess, kitchen remains usable.
Remodeling: 8–16 weeks minimum, often longer depending on permitting and lead times.
In Palm Beach County, many properties are condos or coastal homes with HOA rules. That means noise restrictions, elevator bookings, and specific working hours. Refacing tends to fly under those constraints; remodels require planning around them.
How to Evaluate Your Kitchen?
Before choosing a direction, evaluate what you actually need to fix or improve:
Cabinet Condition. Are boxes solid, level, and free of swelling or warping? Press the cabinet sides and bottoms; if they flex or feel soft, refacing won’t hold up.
Layout & Workflow. Does the existing setup make cooking easy, or are you constantly walking laps between sink, stove, and fridge?
Storage & Functionality. Could better drawer organization or vertical storage change how you use the space?
Plumbing & Electrical. Any outlets in odd places or undersized lighting circuits? Refacing won’t address that; remodeling will.
Appliance Fit. New refrigerators or wall ovens often need reconfigured cabinetry. That’s a remodel territory issue.
If most of your frustrations are visual, refacing can work. If they’re functional, structural, or safety-related, remodeling is the smarter route.
When Refacing Makes Sense
Refacing is ideal when:
Cabinet boxes are structurally sound and under 15 years old.
You like the kitchen layout and want a style update only.
Countertops are staying, and the existing footprint works.
You need a quick, low-mess refresh before selling or moving in.
Average life span: 10–20 years with proper installation and care.
But remember, refacing is purely skin-deep. It won’t correct bad workflow, fix sagging boxes, or solve water-damaged framing.
When a Remodel Is the Better Investment
Kitchen remodeling delivers deeper, longer-lasting value when:
Cabinets are worn, warped, or builder-grade and failing.
You want to open walls or rework the layout.
You need better lighting, power, or ventilation.
Countertops, flooring, or plumbing fixtures need replacing.
You plan to stay in the home long-term or are renovating for resale.
It’s also the only route if you want to integrate high-end features like built-in appliances, under-cabinet lighting, or seamless millwork.
Remodels take longer and cost more, but they reset the kitchen for decades.
Quality, Durability & Longevity
A well-done professional refacing can last 10–20 years. That lifespan depends on the original cabinet construction and the quality of veneer or finish.
New cabinets in a remodel – especially semi-custom or custom – typically last 20–30+ years. They’re built from fresh materials with upgraded joinery and hardware.
For South Florida’s humidity and salt air, that difference in construction quality really matters.

Choosing the Right Contractor
For refacing, look for a specialist who:
Has verified experience with cabinet veneers and finishes
Uses solid wood or commercial-grade laminates, not peel-and-stick products
Provides a written warranty and itemized quote
For remodeling, hire a licensed general contractor and insist on:
Transparent, line-item proposals
Proof of insurance and license
References and past project examples
Clear communication and change-order process
The lowest bid isn’t always the best bid – especially in Palm Beach, where craftsmanship and accountability separate good from regrettable.
Our Role:
We originate apples‑to‑apples proposals from vetted, licensed GCs, review every line for fairness, and act as your owner’s representative throughout.
You contract directly with the GC, but we coordinate design, materials, and oversight so execution matches the approved plan.
Your Kitchen Remodel vs Refacing Decision Framework
Factor | Choose Refacing | Choose Remodeling |
Cabinet Condition | Solid, undamaged | Damaged, water‑exposed, or out of square |
Layout | Already works well | Needs better workflow or openness |
Budget | Under $8K total | $25K+ allocated for real improvement |
Timeline | 1–2 weeks max | Comfortable with 8–16+ weeks |
Countertops | Staying as‑is | Changing material or thickness |
Goal | Short‑term cosmetic refresh | Long‑term function, durability, resale |
Homeownership Horizon | < 3–5 years | ≥ 5 years |
When In Doubt?
Lean remodel. Even with a higher upfront cost, a remodel addresses MEP issues, storage logic, and long‑term durability – things refacing can’t. If budget allows and you plan to stay, remodeling almost always wins on daily experience and value.
Frequently Asked Questions
Can I reface cabinets and add new ones at the same time?
You can, but it often creates color and finish mismatches. If you’re expanding storage or changing layout, a remodel with new custom cabinetry is usually cleaner and more consistent.
How long do refaced cabinets really last in Palm Beach’s humidity?
With professional installation and moisture-resistant materials, refaced cabinets can last 10–15 years. Still, humidity and salt air shorten the lifespan compared to new, sealed cabinetry built for coastal environments.
Will refacing increase my home’s resale value?
It can improve appearance but adds less long-term value than a remodel. Buyers in Palm Beach typically favor kitchens with upgraded cabinetry, modern layouts, and newer systems.
What’s the best time of year to start a kitchen remodel in Palm Beach?
Late fall through early spring is ideal. Contractors’ schedules are more open, and material lead times are shorter before the summer humidity peaks.
Thinking About Remodeling Or New Custom Cabinets?
See what’s possible with your layout, budget & goals.
Conclusion
A good decision on kitchen remodel vs refacing in Palm Beach starts with facts.
Refacing works when cabinet boxes are solid, the layout already functions well, and timing is tight. Remodeling earns its keep when storage, lighting, ventilation, or workflow need real improvement, or when you want custom cabinetry built for South Florida conditions.
Expect refacing to be quicker and cheaper, with limits. Expect a remodel to take longer, cost more, and deliver superior function, durability, and resale.
If you are set on a remodel or custom cabinets, book a free discovery call. We will align scope and budget, map build-ready drawings, involve vetted GCs, and manage materials so execution stays clean.
Pricing Disclaimer
The pricing figures referenced in this article are derived from an 18-month trailing analysis of projects completed by reputable contractors using quality materials and industry-standard construction practices. These figures are intended for general informational purposes only. Market conditions, material costs, labor rates, and contractor availability can change rapidly, and Palm Club Design Group makes no representation or guarantee that the prices cited reflect current costs or will apply to any future project. Readers should obtain up-to-date quotations from qualified professionals before making any budgeting or planning decisions.

